Nazareth, Northampton County

Level 5 drywall finish in Nazareth, PA.

Farmland around Nazareth is still being divided into house lots. In a house that is still being built, the moment to choose Level 5 is before the walls are primed, and it is easy to miss.

A bedroom with its walls freshly skimmed in gray-white compound, a stepladder and cords on the drop cloth below the window.
A room mid skim coat, ladders up.

Level 5 drywall finish for Nazareth homes

Level 5 is a finish for bare drywall. The standard describes a skim over board that has not been painted, and the finishing council's own procedure says the same. A house under construction is the one place where every wall is in that state at once; after the primer and paint go on, the same smoothness is still possible, but as skim coating, a separate piece of work.

Around Nazareth that timing is a live question. The townships that ring the borough are young: about 47 percent of Upper Nazareth's homes date from 2000 or later, and more than half of those in Lower Nazareth and Bushkill townships from 1980 on. New houses in these places often have tall rooms and wide windows, and the walls that will face that light are easiest to settle early.

Nazareth

Upper Nazareth's new houses, before the first coat

Upper Nazareth Township wraps most of the way around the borough, from the Stockertown line west toward Bath, and most of its people live in East Lawn. Its growth has come on former farmland, field by field turned into close-set lots. Rooms that rise two stories, common in houses of the 1990s and 2000s, put a great deal of new board under low side light, and those are the walls to plan for while the house is still at bare drywall.

Two local facts shape the finishing. January here averages about 28°F, and joint compound wants the house held at 50°F or above for two days before finishing and throughout it, so winter work happens in a closed, heated house. And new framing dries and shrinks through its first seasons. A skim gives the wall one even face but cannot stop a fastener popping as the studs move, so a few small repairs after the first winter are normal.

A room in an older house with its walls patched and part-way through a skim coat, a radiator cover under the window.
Walls part-way through a skim coat.

Worth knowing

  1. Read the drywall line

    Ask which finish level the drywall contract names. If it says Level 4 or nothing at all, any room you want at Level 5 has to be added in writing, early.

  2. Not every wall

    Two-story rooms, stair walls and any wall under strong side light or a sheen are the usual candidates. Closets and bedrooms in flat paint seldom need it.

  3. The borough is plaster

    More than half of the borough's homes predate 1940, and their walls are plaster. There the work is repair and a skim coat; Level 5 applies only where new drywall has gone in.

The work

How the work goes

The same care on every job, in every town. The full guide to level 5 drywall finish.

A long empty room with smooth white walls and a pale wood floor, lit by a single window.
Finished walls in window light.
  1. A walkthrough in the room’s light

    Randy walks the rooms with you and says which walls need Level 5 and which don’t. It helps to look at the hour the light is hardest. The walkthrough and written estimate are complimentary.

  2. Joints finished to Level 4

    Tape is bedded in compound at every joint; flat joints get two more coats, inside corners one, screw heads three. Each coat dries hard before the next, with the house kept warm and steady.

  3. A skim coat, edge to edge

    Compound is spread over the entire surface and wiped back tight with a wide knife or trowel, leaving a thin film over paper and joints alike. Where one pass doesn’t cover, a second follows.

  4. Sanded, then primed

    The dry surface is sanded smooth without scuffing the paper beneath. Primer goes on before any color, so the finish coats absorb evenly across the whole wall.

  5. Judged in its own light

    Finish coats go on last. The standard’s test is the one that counts: the wall seen from five feet back, under the light the room will actually have.

Questions

Level 5 drywall finish, Nazareth.

We are building in Upper Nazareth. When should we decide about Level 5?

Before the drywall is primed. Up to that point any wall can be finished to it; afterward, the same smoothness takes a skim coat over paint. A walkthrough while the house is still bare board shows which walls the light will test.

Will a Level 5 finish stop nail pops in a new house?

No. Pops come from framing that shrinks or twists as it dries, and a skim coat changes only the surface. Each pop is reset and refinished when it appears, and on a Level 5 wall the repair is feathered out wide so it stays out of sight.

Our house near Center Square dates from about 1900. Does it need Level 5?

Rarely. Just over half the historic district was standing by 1899, and much of the rest went up for cement plant workers before 1938, in the years when plaster was still the standard wall. On sound plaster the work is repair and then a skim; Level 5 belongs to rooms where drywall has taken the plaster's place, a rebuilt kitchen, say, or a rear addition.

Consultation

Request a private consultation.

Private walkthrough & written estimate, complimentary. Tell us a little about the house and the rooms, and Randy will be in touch to arrange a time.

Hours
Monday – Friday8:30 AM – 5:30 PMSaturday10 AM – 3 PMSundayClosed
Service area
Easton, Bethlehem, Allentown and the greater Lehigh Valley; Bucks County, Pennsylvania.

Fully insured — proof on request. Residential and commercial.